• <option id="vzfph"><form id="vzfph"><rt id="vzfph"></rt></form></option>

        1. <video id="vzfph"></video>

          To solve the whole camp construction scheme
          2017-11-29
          Views: 2016times
          News Sources: CSCEC MODULAR
          Share to:

          More and more engineering temporary buildings and tourist camping areas include the integrated construction such as early site construction, camping house construction, and ancillary facilities (water, electricity, safety, fire protection, communication, and sewage treatment), rather than providing the house products simply.

          We will provide the brand new service mode with the whole camp construction as the core, covering the early planning and design of camp area, construction of camping houses and ancillary facilities, and later site construction link, to assist the enterprise to build the engineering camp and leisure camping area by integrating the service channels.

          TOP